A flexible packaging producer adopted LUSTER’s smart factory solutions for flexible packaging to track production and material losses across 156 machines. The project connected the plant’s manufacturing execution system (MES) with LUSTER’s GMQM Quality Management System, drawing on data from 48 inline inspection systems and other shop-floor collection points.
Flexible packaging material running through production equipment.
Tracking losses as orders grew
The producer reported 10% business growth for three consecutive years. As orders increased, more material was lost on the production lines. The factory had little reliable information about where those losses occurred.
Operators entered production figures by hand. Missing or inaccurate entries made it difficult to calculate capacity or trace waste. One preliminary estimate put daily material waste across the lines at 900 kilometers.
Building the reporting system
The producer formed a dedicated team and chose LUSTER for its experience in packaging print production. The teams designed a reporting system that could collect machine data automatically and give quality managers a view across the plant.
After more than a year of joint work, the plant began using the system by the end of 2022.
How operators used the inspection data
The MES system collected production records automatically. The GMQM Quality Management System established quality baselines and alerted managers when readings drifted, so they could investigate and adjust parameters remotely.
Layout of the flexible packaging plant, where the MES system and GMQM Quality Management System connect production reporting with quality monitoring.
The project team reported 99% data accuracy for automated production reporting and no material mix-ups in the workflow covered by the project.
Managers could generate quality reports on demand. Operators also gained back time they had spent walking the floor to record readings.
One operator recalled visiting 15 machines at least six times a day to collect readings for manual entry. With automated collection, the operator could address production issues directly from the workstation.
How the project team estimated annual savings
The team estimated potential annual savings of at least RMB 200 million. Its starting point was historical material loss of 19.8 million meters per month, or about 240 million meters per year. At an assumed RMB 1 per meter, that represents roughly RMB 240 million in annual material loss before the upgrade. The team did not publish a post-installation loss figure to establish realized savings.